- Market cap
- Revenue
- Net income
- Cash on hand
- Gross margin
- Net margin
- EPS
- P/E ratio
Company to Showcase On-Site Power Solutions as Growing Energy Demand and Grid Constraints Reshape Data Center Development LOS ANGELES--(BUSINESS WIRE)-- Capstone Energy+, Inc. (NASDAQ: CEPL) (“Capstone” or the “Company”), a leading provider of behind-the-meter clean gas turbine energy solutions for industrial and commercial operations, as well as solutions designed for emerging data center applications, today announced its participation in two upcoming data center industry events: Yotta 2026 in Las Vegas and Data Centre World Asia in Singapore. As data center development accelerates to support AI and other digital infrastructure, access to reliable power is becoming an important consideration for operators and developers. At both events, Capstone will engage with industry leaders on the evolving energy needs of the data center market and highlight how its scalable, fuel-flexible, on-site generation solutions can support reliable power and continued growth. “Today, the conversation around data center power has fundamentally changed. The question is no longer simply, ‘Can you provide the power?’ It is, ‘Can you provide it responsibly?’” said Vince Canino, President and CEO of Capstone Energy+. “As power demand accelerates and data centers move closer to communities, speed-to-power alone is no longer enough. The industry must address reliability, environmental impact, community acceptance, and long-term operability simultaneously. “Capstone’s behind-the-meter gas turbine technology is designed to address these challenges. Featuring a single moving part riding on a cushion of air, our turbines deliver reliable power with ultra-low emissions, low noise, no water, no lubricating oil, or no coolant. We look forward to engaging with industry leaders at Yotta and Data Centre World Asia to discuss how responsible on-site power generation can support the next generation of data center infrastructure.” Yotta 2026 Date: September 28–30, 2026 Location: Caesars Forum, Las Vegas Booth: #1237 Event Details: Yotta 2026 is a global conference focused on AI infrastructure, energy systems, and digital infrastructure. It brings together 6,000+ leaders across data centers, cloud, power, and investment to explore how the systems powering AI are being built and scaled. At Yotta, Capstone will highlight its Energy Solution Program (ESP) for data center applications, including modular power configurations designed to provide scalable, on-site generation that can expand alongside growing energy requirements. Capstone representatives will also participate in scheduled one-on-one meetings with industry stakeholders to discuss data center power requirements and potential applications for Capstone’s technology. Data Centre World Asia Date: September 29–30, 2026 Location: Marina Bay Sands Expo and Convention Centre, Singapore Stand: B2 U56 Event Details: Data Centre World Asia is a leading data center exhibition and conference in Asia, bringing together data center and digital infrastructure professionals to explore developments across areas including AI-ready infrastructure, power and energy efficiency, cooling, and data center operations. Capstone will co-exhibit with HOLLO APAC, a Singapore-based affiliate of Capstone’s distributor, Kelan Technology, highlighting the Company’s on-site power solutions and its ability to support data center customers through its global distributor network. Capstone advisor Carl F
Follow-On Deployment Expands Customer's Capstone Gas Turbine Fleet to 12 MW Across Multiple Interconnected Midstream Facilities LOS ANGELES--(BUSINESS WIRE)-- Capstone Energy+, Inc. (NASDAQ: CEPL) (“Capstone” or the "Company”), a leading provider of behind-the-meter clean gas turbine energy solutions for industrial and commercial operations, as well as solutions designed for emerging datacenter applications, today announced the delivery of two additional C1000S Signature Series gas turbines to support the continued expansion of a major U.S. midstream natural gas infrastructure project in southern New Mexico. Secured through Capstone’s authorized distributor, Horizon Power Systems, the additional 2 MW deployment represents the latest phase of a multi-year program for a major midstream operator. The order expands the customer’s fleet to a total of 12 Capstone C1000S gas turbine systems, providing 12 MW of power generation operating across six interconnected gas facilities. Capstone’s patented gas turbine technology, featuring a single moving part supported by air bearings, delivers low-maintenance, low-emissions on-site power for a wide range of critical infrastructure assets. The multi-bay turbine configuration provides integrated redundancy, maximizing uptime reliability and supporting continuous operations and uninterrupted gas delivery to market. The project supports a large-scale natural gas infrastructure system spanning more than 200,000 acres and more than 200 miles of gathering pipelines. With utility power unavailable at several remote compressor stations, the customer required a rapidly deployable distributed power solution capable of supporting critical operations, meeting stringent emissions and uptime reliability requirements in remote, high-altitude environments subject to extreme seasonal temperature changes. “From the early stages of Capstone’s development, oil and gas operators recognized the value of our gas turbine technology. Our low maintenance design makes our products particularly well suited for remote and challenging operating environments,” said Vince Canino, President and CEO of Capstone Energy+. “As energy infrastructure operators continue expanding into remote regions, they need power solutions that can be deployed quickly, operate reliably and deliver exceptional redundancy.” Canino continued, “The client's decision to continue expanding its Capstone fleet is a testament to the proven value of our technology and the strength of our repeatable business model. We are honored by the client’s confidence in Capstone’s technology to support critical infrastructure projects time and time again. It also speaks volumes about the outstanding work from our distributor, Horizon Power Systems, whose commitment to customer service and operational excellence has been instrumental in supporting this deployment." The deployment began in 2024 with an initial rental fleet of eight C1000S gas turbine systems. Following the project’s successful performance, the client expanded the deployment in 2025 with the purchase of two C1000S systems. In 2026, the client exercised its option to purchase the original eight rental units as permanent assets and further expanded the project with the acquisition of two additional C1000S gas turbine systems, bringing the total fleet to 12 C1000S units. "This project demonstrates the value of giving customers a flexible path from rental deployment to long-term ownership," said Sam Henry, Principal of Horizon Power Systems. "By combining Capstone's proven gas turbine technology with responsive local service and support, we've helped deliver a reliable power solution for a complex, fast-moving project." The announcement
LOS ANGELES--(BUSINESS WIRE)-- Capstone Energy+, Inc. (NASDAQ: CEPL) (“Capstone” or the “Company”), a leading provider of behind-the-meter clean microturbine energy solutions for industrial and commercial businesses, as well as solutions designed for emerging data center applications, today announced that members of its management team are scheduled to participate in the H.C. Wainwright 28thAnnual Global Investment Conference. Date: September 14-16, 2026Location: New York City, NYFormat: Presentation and one-on-one meetings Management will deliver a presentation on Monday, September 14 at 10:00 a.m. Eastern Time (7:00 a.m. Pacific Time). The presentation will be webcast live and available for replay here. Vince Canino, President & Chief Executive Officer, John Miller, Interim Chief Financial Officer, Candice Graves, Chief Accounting Officer, and Kimberly Nisler, Director, Investor Relations & Marketing, will represent Capstone Energy+ at the conference. If you are interested in attending the presentation or scheduling a time to meet with management, please contact your H.C. Wainwright representative. About Capstone Energy+ For nearly four decades, Capstone Energy+ has designed, developed, and delivered proven behind-the-meter, on-site energy solutions that help businesses operate with certainty in an increasingly constrained power environment. Our evolution from “Green” to “Plus” reflects who we are today, delivering clean, innovative energy solutions that go beyond electricity. Capstone Energy+: On Site. On Demand. Always On. With more than 10,800 units shipped across 89 countries through our global distributor network, Capstone provides highly reliable, low-maintenance, fuel-flexible power systems engineered for mission-critical operations. Built on our core 30kW, 65kW, and 200kW microturbine platforms, our scalable multi-megawatt solutions are designed for rapid deployment, continuous operation, and simplified maintenance. Capstone Energy+ serves hospitals, agriculture, and industrial facilities and is developing solutions for emerging data center applications where uptime and energy certainty are essential. Beyond power generation, our solutions support the circular economy by using fuels derived from waste streams and capturing waste heat to produce valuable thermal energy that can reduce overall fuel consumption and associated emissions compared with separate electricity and heat production, depending on the fuel, application, and operating conditions. To support evolving customer needs, Capstone also offers flexible Energy as a Service solutions, including power purchase or energy service agreements (PPAs/ESAs), leasing, rentals, and embedded service contracts (ESCs) designed to reduce upfront costs, accelerate deployment, and provide life-cycle cost predictability. Our modular plug-and-play architecture is designed to help customers scale capacity, simplify integration, and adapt to growing energy demands with resilient on-site power solutions. For more information about the Company, please visit www.CapstoneEnergyPlus.com Follow Capstone Energy+ on X, LinkedIn, Instagram, <a h
LOS ANGELES--(BUSINESS WIRE)-- Capstone Energy+, Inc. (NASDAQ: CEPL) (“Capstone” or the “Company”), a leading provider of behind-the-meter clean microturbine energy solutions for industrial and commercial businesses, as well as solutions designed for emerging data center applications, today announced that members of its management team are scheduled to participate in the Needham Virtual Industrial Tech, Robotics, & Power 1x1 Conference. Date: August 18, 2026 Location: Virtual Format: one-on-one meetings Vince Canino, President & Chief Executive Officer and Candice Graves, Chief Accounting Officer, will represent Capstone Energy+ at the conference. About Capstone Energy+ For nearly four decades, Capstone Energy+ has designed, developed, and delivered proven behind-the-meter, on-site energy solutions that help businesses operate with certainty in an increasingly constrained power environment. Our evolution from “Green” to “Plus” reflects who we are today, delivering clean, innovative energy solutions that go beyond electricity. Capstone Energy+: On Site. On Demand. Always On. With more than 10,800 units shipped across 89 countries through our global distributor network, Capstone provides highly reliable, low-maintenance, fuel-flexible power systems engineered for mission-critical operations. Built on our core 30kW, 65kW, and 200kW microturbine platforms, our scalable multi-megawatt solutions are designed for rapid deployment, continuous operation, and simplified maintenance. Capstone Energy+ serves critical industries including data centers, hospitals, agriculture, and industrial facilities where uptime and energy certainty are essential. Beyond power generation, our solutions support the circular economy by converting waste streams into usable fuel and capturing waste heat to produce valuable thermal energy with a lower carbon footprint. To support evolving customer needs, Capstone also offers flexible Energy as a Service solutions, including power purchase or energy service agreements (PPAs/ESAs), leasing, rentals, and embedded service contracts (ESCs) designed to reduce upfront costs, accelerate deployment, and provide life-cycle cost predictability. Our modular plug-and-play architecture enables customers to scale quickly, reduce integration risk, and adapt to growing energy demands with resilient, always-available power solutions. For more information about the Company, please visit www.CapstoneEnergyPlus.com Follow Capstone Energy+ on X, LinkedIn, Instagram, Facebook, and YouTube. View source version on businesswire.com: https://www.businesswire.com/news/home/20260818269014/en/ Capstone Energy+, Inc. ir@CapstoneEnergyPlus.com 818-407-3628 Media and Investor Inquiries: Gateway Group, Inc. CEPL@gateway-grp.com 949-574-3860 Source: Capstone
Gross Profit Increased 16% to $8.8 Million Company Generated $5.4 Million in Operating Cash Flow LOS ANGELES--(BUSINESS WIRE)-- Capstone Energy+, Inc. (NASDAQ: CEPL) (“Capstone” or the “Company”), a leading provider of behind-the-meter clean microturbine energy solutions for industrial and commercial businesses, as well as solutions designed for emerging data center applications, today reported its financial results for the fiscal first quarter 2027, ended June 30, 2026. Fiscal First Quarter 2027 and Recent Operational Highlights Commenced trading on the NASDAQ Stock Market under the ticker symbol “CEPL.” The Company’s common stock began trading on the Nasdaq Global Market on July 8th, a milestone that broadens access to institutional investors and enhances visibility with the investment community. Secured a CHP project for a premier Utah hospitality destination. The order includes two C800 Signature Series microturbines designed to provide reliable on-site electricity and recovered thermal energy for a large-scale golf and hospitality resort, showing the economic and operational benefits of combined heat and power in energy-intensive commercial settings. Received a follow-on order from Chilean state-owned energy company ENAP. The additional C800 Signature Series microturbine will expand the Capstone-powered system at ENAP’s Gregorio Refinery from 1.4 MW to 2.2 MW, reinforcing the reliability of Capstone’s technology in remote, mission-critical environments. Expanded the Energy-as-a-Service model through a flare-gas recovery project in Gabon. Under a 36-month lease-to-own agreement, Capstone will provide a C600 Signature Series microturbine to Maurel & Prom to convert recovered associated gas into reliable on-site electricity. Advanced a 2 MW CHP installation at Scripps Mercy Hospital San Diego. Two C1000 Signature Series microturbines are designed to provide highly efficient on-site electricity and thermal energy while supporting island-mode operation during utility outages. Fiscal First Quarter 2027 Financial Results Results compare the fiscal first quarter ended June 30, 2026 (“Q1 2027”) to the fiscal first quarter ended June 30, 2025 (“Q1 2026”) unless otherwise indicated. Revenue for Q1 2027 was $24.9 million, compared to $27.9 million in Q1 2026. The decrease was primarily due to the timing of large product orders, project milestones and shipment schedules, as well as lower rental utilization amid uncertainty surrounding oil prices. The performance was partially offset by growth in Parts and Service revenue, which increased 21% to $9.7 million. Gross profit for Q1 2027 increased 16% to $8.8 million, up from $7.6 million, while gross margin expanded 800 basis points to 35% from 27%. The improvement primarily reflected a favorable product mix, including the sale of previously rented microturbine systems, the continued benefit of cost-reduction initiatives, and a contribution from Distribution Services revenue. Income from operations was $1.0 million, compared to a loss from operations of $0.2 million in Q1 2026. Net income for Q1 2027 was approximately $0.04 million, compared to a net loss of $0.7 million in Q1 2026. Reported net loss per share for Q1 2027 was $0.03, compared to a reported net loss per share of $0.04 in Q1 2026. Q1 2027 net loss attributable to common stockholders included a $1.0 million non-cash adjustment related to the accretion of the Operating Subsidiary’s Preferred Units despite operating net income. Adjusted EBITDA, a non-GAAP metric reconciled below, was $2.7 million for