Income statement waterfall. Green diagonal stripes add to the running result, red diagonal stripes subtract from it, and a thin axis line marks the loss-zone boundary.
- Revenue: $221.88M. Running result $221.88M. Commercial Concrete Segment: $91.04M. Heavy Civil Marine Construction Segment: $130.84M.
- Cost of revenue: −$198.95M. Running result $22.93M.
- Gross profit: $22.93M. Running result $22.93M.
- Selling, general and administrative expenses: −$24.4M. Running result −$1.47M.
- Gain on disposal of assets, net: −$153K. Running result −$1.62M.
- Other operating benefit: $306K. Running result −$1.32M.
- Operating income: −$1.32M. Running result −$1.32M.
- Other expense: −$2.36M. Running result −$3.67M.
- Pre-tax loss: −$3.67M. Running result −$3.67M.
- Income tax expense: −$474K. Running result −$4.15M.
- Net loss: −$4.15M. Running result −$4.15M.